The City Council of La Mata, faced with the social alarm caused by learning that the company ENERGÍAS RENOVABLES DE ORMUZ, SL, promotes the “Maestrazgo_PEOL-449 AC Cluster”, with a total of 22 Wind Farm projects and a high voltage evacuation line of 400 Kv that runs next to the town of La Mata, has commissioned AUG-ARQUITECTOS SLP to prepare an allegation to said initiative.
The allegation refers to the so-called “ALTERNATIVE B”, corresponding to the underground and aerial variant of the “North Corridor” and, more specifically, to the aerial part of the energy transmission line that runs between supports 54 to 62 ( both inclusive), located in the municipality of La Mata. The aforementioned alternative involves the construction of an overhead power evacuation line of 400 Kv, of which eight IM 400 towers, with variable height from 33 to 44 meters, a width at the base of seven meters and horizontal development, in the upper levels, 15 meters, which they would pass a few meters from emblematic buildings of the town, including its own urban area.